Elizabeth line
London's east–west railway, built as Crossrail. New twin-bore tunnels, 13 miles (21 km) long, link the Great Western main line from Reading and Heathrow with the Great Eastern to Shenfield and a new branch to Abbey Wood. The central section opened in May 2022, and the project's estimated final cost was £18.9bn, not counting the trains and depot.
Facts
- Opened
- 24 May 2022
- Termini
- Reading / Heathrow Terminals 4 and 5 – Shenfield / Abbey Wood
- Type
- main-line railway with a tunnelled central section
- Depots
- Old Oak Common (trains), Plumstead (infrastructure maintenance)
- Operating company
- GTS Rail Operations, for TfL (MTR until 25 May 2025)
- Shares track
- The central section, from Westbourne Park to Abbey Wood and Pudding Mill Lane, belongs to Rail for London (Infrastructure). Beyond it the line runs on Network Rail's Great Western and Great Eastern main lines, and the end of the Heathrow branch belongs to Heathrow Airport.
9 cars, 672 ft (204.7 m)
Route 41 stations
Reading – Shenfield via Paddington 34
Whitechapel – Abbey Wood 5
Heathrow Terminal 5 – Hayes & Harlington 3
Heathrow Terminals 2 & 3 – Heathrow Terminal 4 2
Schematic, not to scale. Ringed stations are interchanges. Each strip is one branch, between junctions or termini. Station order from TfL open data.
| Station | Zone | Interchanges |
|---|---|---|
| Reading | National Rail | |
| Twyford | National Rail | |
| Maidenhead | National Rail | |
| Taplow | National Rail | |
| Burnham | National Rail | |
| Slough | National Rail | |
| Langley | National Rail | |
| Iver | National Rail | |
| West Drayton | 6 | National Rail |
| Hayes & Harlington | 5 | National Rail |
| Southall | 4 | National Rail |
| Hanwell | 4 | |
| West Ealing | 3 | National Rail |
| Ealing Broadway | 3 | Central, District, National Rail |
| Acton Main Line | 3 | National Rail |
| Paddington | 1 | Bakerloo, Circle, District, Hammersmith & City, National Rail |
| Bond Street | 1 | Central, Jubilee |
| Tottenham Court Road | 1 | Central, Northern |
| Farringdon | 1 | Circle, Hammersmith & City, Metropolitan, National Rail |
| Liverpool Street | 1 | Central, Circle, Hammersmith & City, Metropolitan, Overground (Weaver), National Rail |
| Whitechapel | 2 | District, Hammersmith & City, Overground (Windrush) |
| Stratford | 2/3 | Central, Jubilee, Overground (Mildmay), DLR, National Rail |
| Maryland | 3 | |
| Forest Gate | 3 | |
| Manor Park | 3/4 | |
| Ilford | 4 | National Rail |
| Seven Kings | 4 | National Rail |
| Goodmayes | 4 | |
| Chadwell Heath | 5 | |
| Romford | 6 | Overground (Liberty), National Rail |
| Gidea Park | 6 | National Rail |
| Harold Wood | 6 | |
| Brentwood | 9 | |
| Shenfield | National Rail | |
| Canary Wharf | 2 | Jubilee, DLR |
| Custom House | 3 | DLR |
| Woolwich | 4 | |
| Abbey Wood | 4 | National Rail |
| Heathrow Terminal 5 | 6 | Piccadilly, National Rail |
| Heathrow Terminals 2 & 3 | 6 | Piccadilly, National Rail |
| Heathrow Terminal 4 | 6 | Piccadilly |
Stations, zones and interchanges from TfL open data (2026-10-07). National Rail interchanges are listed where TfL groups the stations together.
Some trains from Reading and Heathrow end in Paddington's main-line station, and some from Shenfield in Liverpool Street's. The diagram shows the Elizabeth line's own platforms.
See the Elizabeth line on the London map, its stations at their real positions among London’s other lines.
Rolling stock
- Class 345 since 2017
History 18
- The Crossrail Bill goes to Parliament.
- The Crossrail Act receives Royal Assent.
- Construction begins at Canary Wharf.
- Tunnelling begins. Eight tunnel boring machines drive 26.1 miles (42 km) of tunnel, finishing in May 2015.
- TfL Rail takes over the stopping trains between Liverpool Street and Shenfield.
- The Queen visits Bond Street, and Crossrail is named the Elizabeth line.
- The first Class 345 train enters passenger service.
- TfL Rail takes over the Heathrow Connect trains between Paddington and Heathrow.
- Crossrail announces that the central section, due in December 2018, will be late.
- TfL Rail takes over the stopping trains between Paddington and Reading.
- The Queen visits Paddington's Elizabeth line station and unveils a plaque.
- The central section opens from Paddington to Abbey Wood, with 12 trains an hour, Monday to Saturday. Bond Street isn't ready.
- Bond Street station opens.
- Trains from Reading, Heathrow and Shenfield start running through central London, and Sunday services begin.
- The full timetable starts: 24 trains an hour through the centre at peak times, and direct trains from Shenfield to Heathrow.
- Ten more trains are ordered from Alstom, with maintenance to 2046.
- GTS Rail Operations takes over running the line from MTR.
- The first of the ten new trains starts testing at Derby. The line has carried more than 850 million journeys since opening.
Sources 24
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
Show the 24 sources from Transport for London, Crossrail Ltd, London Transport Museum and 10 more
- The Elizabeth line London Transport Museumlength (118 km), 41 stations
- TOC key statistics: Elizabeth line, April 2025 to March 2026 Office of Rail and Road, 6 August 2026118 km of route; 257.4 million journeys in 2025–26 (ORR's estimate from ticket sales)
- The Crossrail project in numbers (archived) Crossrail Ltd, c. 202241 stations, 10 of them new; 42 km of tunnel; eight tunnel boring machines
- Elizabeth line post-opening evaluation: full report Transport for London and Department for Transport, 30 May 202521 km twin-bore tunnel, £18.9bn estimated final cost, 2023 timetable
- Crossrail: a progress update (summary) National Audit Office, 9 July 2021what the £18.9bn includes and excludes
- Crossrail Central Operating Section Network Statement 2025 Rail for London (Infrastructure), 2025central section limits and ownership, ten central-section stations, Heathrow ownership, depots
- Operational and programme completion update TfL Elizabeth Line Committee, 18 May 202324 trains an hour at peak in the central section from May 2023
- GTS Rail Operations Limited announced as new operator for the Elizabeth line Transport for London (press release), 19 November 2024operator: GTS Rail Operations from 25 May 2025
- TfL Colour Standard, issue 11 Transport for London, August 2026line colour: RGB 96/57/158
- TfL Unified API: Line Route Sequence Transport for London (Powered by TfL Open Data)station order, zones and interchanges
- Elizabeth line to open on 24 May 2022 Transport for London (press release), 4 May 2022history
- Crossrail Act 2008 (c. 18), as enacted legislation.gov.uk, 22 July 2008history
- Project history (archived) Crossrail Ltd, c. 2022history
- Mayor hails transformed services as TfL takes over West Anglia routes Transport for London (press release), 1 June 2015history
- New trains (archived) Crossrail Ltd, c. 2022history
- Crossrail to become the Elizabeth line in honour of Her Majesty the Queen Department for Transport, 23 February 2016history
- Her Majesty The Queen visits Paddington Elizabeth line station Transport for London (press release), 17 May 2022history
- Elizabeth line (Board paper) Transport for London Board, 19 July 2017history
- TfL to operate Heathrow Connect services ahead of Elizabeth line opening Transport for London (press release), 18 May 2018history
- Derailed: getting Crossrail back on track London Assembly Transport Committee, April 2019history
- TfL Rail begins operating services between London Paddington and Reading Transport for London (press release), 15 December 2019history
- Direct Elizabeth line services into central London from Reading, Heathrow and Shenfield start today Transport for London (press release), 6 November 2022history
- Alstom signs €430 million contract for 10 Aventra trains and associated maintenance for the Elizabeth line Alstom (press release), 14 June 2024history
- First of ten new Elizabeth line trains enters the test track in Derby Transport for London (press release), 5 June 2026history