Rolling stock › In serviceData updated

Class 345

Bombardier's Aventra design, built in Derby for the Elizabeth line: nine walk-through, air-conditioned cars, about 673 ft (205 m) long, with three double doors on each side of every car. The first trains, from June 2017 between Liverpool Street and Shenfield, ran as seven cars (DMS-PMS-MS1-TSW-MS2-PMS-DMS, 350 seats), because Liverpool Street's platforms were too short for nine; they were lengthened to nine cars once the platforms were extended in 2021.

Class 345, schematic side elevation, 9 cars
Class 345, schematic side elevation, 9 cars, in operation: pantographs raised to a contact wire at 4.25 mcontact wire 13 ft 11 in (4.25 m)
672 ft (204.73 m) (the cars’ lengths added)

Class 345 · schematic drawing GB Trains · gbtrains.uk/stock/345/ · CC BY 4.0

Schematic side elevation of a full train, drawn from the dimensions below. Branding left out: the Elizabeth line roundel and the numbers. In operation: the pantographs raised to a contact wire 13 ft 11 in (4.25 m) above the rail, the nominal height in the Elizabeth line's tunnels (Crossrail Learning Legacy, 2018; one wire, schematic). Drawn at 10 px per metre. Download SVG Download SVG · Use this drawing

You’re welcome to use this drawing

Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:

Drawing: GB Trains, gbtrains.uk, CC BY 4.0

Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers

Used it somewhere? Tell us where → (opens in a new tab)

Liveries

Special liveries 2

Former liveries 1

TfL Rail branding on the white/purple-black-front unitsFormer22 Jun 2017 to 24 May 2022Not drawn yet

Compare with other trains →

Type
Electric multiple unit
Builder
Bombardier Transportation (now Alstom), Derby
Family
Aventra, with Class 710 Aventra, Class 720 Aventra, Class 701 Arterio, Class 730 Aventra
Built
2015–2019
In service
since 2017
Lines
Elizabeth
Formation
9 cars, walk-through
Trains in fleet
70, plus 10 more being added (the first in service from 28 August 2026)
Power
25 kV AC overhead · how it works
Bogies
Bombardier FLEXX Eco bogies · drawn with the same bogie component as Class 701 Arterio, Class 710 Aventra, Class 720 Aventra, Class 730 Aventra
Train length
672 ft (204.73 m) (the cars’ lengths added)
Car height
12 ft 4 in (3.76 m)
Car width
9 ft 1 in (2.772 m)
Profile
main-line
Walk-through
Yes
Air-conditioned
Yes
Seats per train
454
Total capacity
1,497 at full load (454 seats: 412 fixed and 42 tip-up or perch, + 1,043 standing), calculated from floor area; 12 more tip-up seats fold down in the four wheelchair spaces
Status
In service. The first of ten more trains, ordered from Alstom in June 2024, entered passenger service on 28 August 2026; TfL expects the rest over 2026 and 2027. Operated for TfL by GTS Rail Operations since 25 May 2025 (MTR Elizabeth line before).

Car types

CodeCarLengthWeight (tare)Doors per side
DMSDriving motor77 ft 6 in23.615 m37 t3 double
PMSPantograph car73 ft 10 in22.50 m31.5 t3 double
MS1Motor car73 ft 10 in22.50 m30 t3 double
MS2Motor car73 ft 10 in22.50 m39 t3 double
MS3Motor car73 ft 10 in22.50 m37 t3 double
TSWTrailer with wheelchair spaces73 ft 10 in22.50 m36.5 t3 double

Sources

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

Show the 53 sources from Wikimedia Commons, Transport for London, Wikipedia and 9 more
unverified

Know a source for one of these? Send it to us → (opens in a new tab)

Top