Rolling stock › In serviceData updated

CR4000 (Bombardier Flexity Swift)

The trams the network opened with: 24 three-section Bombardier trams, with two double doors a side on each end section. Since 2012 they have run alongside Stadler's Variobahns, 12 of them by 2016.

CR4000 (Bombardier Flexity Swift), schematic side elevation, 3 cars
CR4000 (Bombardier Flexity Swift), schematic side elevation, 3 cars, in operation: pantographs raised to a contact wire at 5.8 mcontact wire 19 ft 0 in (5.8 m)
99 ft (30.1 m) long

CR4000 (Bombardier Flexity Swift) · schematic drawing GB Trains · gbtrains.uk/stock/cr4000/ · CC BY 4.0

Schematic side elevation of a full train, drawn from the dimensions below. Branding left out: Tramlink's wordmark and the numbers. In operation: the pantograph raised to a contact wire 19 ft 0 in (5.8 m) above the rail, the normal height of tramway wires over a carriageway (The Highway Code, rule 307; one wire, schematic). Drawn at 10 px per metre. Download SVG Download SVG · Use this drawing

You’re welcome to use this drawing

Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:

Drawing: GB Trains, gbtrains.uk, CC BY 4.0

Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers

Used it somewhere? Tell us where → (opens in a new tab)

Liveries 1

London TramsLondon TramsWhite with the windows in a black band, lime green ends and roofline, a blue skirt under a green line; from photographs of 2543 (2025) and 2551 (2011)Shown above

Special liveries 1

Former liveries 3

Red and white fleet liveryRan as Croydon Tramlink / Tramtrack CroydonFormer1999-2000 to 2008-2009Not drawn yet
FirstGroup white, blue and pink (tram 2550)FormerApr 2000 to Oct 2001Not drawn yet
Amey yellow all-over advert (tram 2542)Former1999 to 2001Not drawn yet

Compare with other trains →

Type
Tram, three sections, 76% low floor
Builder
Bombardier, Vienna (Austria)
Built
1998–1999
In service
since 2000
Lines
Trams
Formation
Three sections (14.35 + 1.4 + 14.35 m), 99 ft (30.1 m), double-ended
Trains in fleet
24 built (2530–2553); 22 in service
Top speed
50 mph (80 km/h)
Power
750 V DC overhead; four 120 kW motors · how it works
Bogies
Bombardier Flexity Swift motor bogies under the end sections (CR4000); a trailer running gear under the centre section, its four wheels on stub axles (CR4000)
Train length
99 ft (30.10 m)
Car height
11 ft 10 in (3.60 m)
Car width
8 ft 8 in (2.65 m)
Profile
tram
Walk-through
Yes
Air-conditioned
No
Seats per train
70
Total capacity
70 seats and 138 standing at 4 per m²; two wheelchair or pram spaces (Bombardier)
Status
In service. 2551 was written off after the Sandilands derailment of 9 November 2016, and the good halves of 2542 and 2548 were joined into one tram, 2548, which was back in service by May 2026. TfL plans 24 new trams to replace them for the early 2030s: four makers were invited to bid in September 2024, the new trams to come subject to funding.

Car types

CodeCarLengthDoors per side
ENDPEnd section, with a cab and the pantograph47 ft 1 in14.35 m2 double
ENDEnd section, with a cab47 ft 1 in14.35 m2 double
MIDCentre section, over the trailer bogie4 ft 7 in1.40 m

Sources

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

Show the 21 sources from British Trams Online, Wikimedia Commons, Transport for London and 5 more
unverified

Know a source for one of these? Send it to us → (opens in a new tab)

Top