Rolling stock › In serviceData updated

Class 756 FLIRT

Stadler FLIRTs that can run from overhead wires, batteries or diesel: the first tri-mode trains in passenger service in Britain, from November 2024. They brought electric trains to the Valley Lines north of Cardiff; as the Class 398 tram-trains take over there, they are to move to the Rhymney and Vale of Glamorgan lines. They were ordered from Stadler in January 2019, with the Class 231s. The first carried passengers in the week before TfW's launch on 18 November 2024, on the Merthyr and Aberdare lines, and all 24 were in service by the end of September 2025.

Class 756 FLIRT, schematic side elevation, 5 cars
Class 756 FLIRT, schematic side elevation, 5 cars, in operation: pantographs raised to a contact wire at 5.0 mcontact wire 16 ft 5 in (5.0 m)
265 ft (80.7 m) over couplers

Class 756 FLIRT · schematic drawing GB Trains · gbtrains.uk/stock/756/ · CC BY 4.0

Schematic side elevation of a full train, drawn from the dimensions below. A four-car 756/1, measured from Stadler's data sheet, on the Class 755's measured car bodies. Transport for Wales's T roundel behind each cab door is drawn as a plain shape, sized and placed from photographs of 756001 and 756007. Branding left out: the 'Metro' wordmark and chevrons, the bilingual name with its small roundel and the numbers. In operation: the pantographs raised to a contact wire 16 ft 5 in (5.0 m) above the rail, the Core Valley Lines' average height (Amey Infrastructure Wales, 2025; one wire, schematic). Drawn at 10 px per metre. Download SVG Download SVG · Use this drawing

You’re welcome to use this drawing

Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:

Drawing: GB Trains, gbtrains.uk, CC BY 4.0

Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers

Used it somewhere? Tell us where → (opens in a new tab)

Compare with other trains →

Type
Tri-mode multiple unit (electric, battery and diesel)
Builder
Stadler, Bussnang (Switzerland)
Family
FLIRT, with Class 231 FLIRT, Class 745 FLIRT, Class 755 FLIRT
In service
since 2024
Operators
Transport for Wales
Formation
3 or 4 passenger cars with a short power pack car: 213 ft (65.0 m; 756/0) or 265 ft (80.7 m; 756/1)
Trains in fleet
24
Fleets
Transport for Wales: 24
Top speed
75 mph (121 km/h)
Power
25 kV AC overhead, traction batteries, or 480 kW of diesel generation in the power pack car, which also carries the batteries; 2,600 kW at the wheel on 25 kV, 1,300 kW on batteries · how it works
Bogies
Stadler FLIRT bogies, with Jacobs bogies between cars · drawn with the same bogie component as Class 231 FLIRT, Class 745 FLIRT, Class 755 FLIRT
Train length
265 ft (80.70 m)
Car height
12 ft 10 in (3.915 m)
Car width
8 ft 11 in (2.72 m)
Profile
main-line
Air-conditioned
Yes
Seats per train
158
Total capacity
Four-car: 158 seats, 32 tip-up and 204 standing. Three-car: 118 seats, 24 tip-up and 148 standing (Stadler; TfW's seat counts agree)
Status
In service: 24 units, 7 three-car (756/0) and 17 four-car (756/1), all in service since September 2025: on the Merthyr, Aberdare and Treherbert lines in September 2026, and between Coryton, Caerphilly and Penarth since July 2025. Owned by SMBC Leasing and Equitix.

Car types

CodeCarLengthDoors per side
DMSDriving motor standard (DMS), over the motor bogie69 ft 1 in21.05 m2 double
PTSWPantograph trailer standard with wheelchair spaces and toilet (PTSW)51 ft 6 in15.70 m1 double
PPPower pack car (PP)23 ft 7 in7.20 m
PTSPantograph trailer standard (PTS), in four-car units51 ft 6 in15.70 m2 double

Doorways: 4 ft 3 in (1,300 mm) clear entrance width (Stadler).

Sources

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

Show the 26 sources from Wikimedia Commons, Stadler, Transport for Wales Rail Ltd and 8 more
unverified

Know a source for one of these? Send it to us → (opens in a new tab)

Top