Rolling stock › In serviceData updated

Class 395 Javelin

High-speed trains from St Pancras over High Speed 1 into Kent, which Southeastern calls the UK's fastest trains. They ran the Olympic Javelin shuttles in 2012.

Class 395 Javelin, schematic side elevation, 6 cars
Class 395 Javelin, schematic side elevation, 6 cars, in operation: pantographs raised to a contact wire at 5.08 mcontact wire 16 ft 8 in (5.08 m)
399 ft (121.76 m) over couplers

Class 395 Javelin · schematic drawing GB Trains · gbtrains.uk/stock/395/ · CC BY 4.0

Schematic side elevation of a full train, drawn from the dimensions below. Drawn in the original Southeastern high-speed livery, from the 2008 livery drawings; since March 2025 the fleet is being re-wrapped in Southeastern's new livery (395015 first). Branding left out: Southeastern's wordmark and the numbers. In operation: the pantographs raised to a contact wire 16 ft 8 in (5.08 m) above the rail, HS1's normal height (Network Rail (High Speed), 2026; one wire, schematic). Drawn at 10 px per metre. Download SVG Download SVG · Use this drawing

You’re welcome to use this drawing

Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:

Drawing: GB Trains, gbtrains.uk, CC BY 4.0

Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers

Used it somewhere? Tell us where → (opens in a new tab)

Liveries 2

SoutheasternSoutheastern Highspeed (2009)From Southeastern's 2008 livery drawingsBeing replaced: Southeastern's new livery, on 395015 from 2025 and spreadingBeing replacedfrom 2009Shown above
SoutheasternSoutheastern's new livery395015 first, in 2025, with the Railway 200 graphicVinyl, spreading across the fleet; replacing the original livery the drawing above shows.from 2025Not drawn yet

Special liveries 3

Compare with other trains →

Type
High-speed electric multiple unit
Builder
Hitachi, Kasado (Japan)
Built
2007–2009
In service
since 2009
Operators
Southeastern
Formation
6 cars (DPT-MS-MS-MS-MS-DPT)
Trains in fleet
29
Fleets
Southeastern: 29
Top speed
140 mph (225 km/h) on 25 kV AC (High Speed 1); 99 mph (160 km/h) on 750 V DC
Power
25 kV AC overhead and 750 V DC third rail; sixteen 210 kW motors, 3,360 kW a unit · how it works
Bogies
Hitachi bolsterless bogies (Class 395)
Train length
399 ft (121.76 m)
Coupled
2 × 6 cars, 799 ft (243.5 m) (over couplers)
Car height
12 ft 7 in (3.845 m), read off the 2008 livery sheet, not a printed figure
Profile
main-line
Seats per train
340
Total capacity
340 seats and 12 tip-up seats
Status
In service with Southeastern, all 29 units. Every interior was refreshed by May 2025 (the first phase of a £27m programme with Eversholt Rail and Hitachi Rail; 395017 the last, back in service on 19 May 2025); the second phase brings new passenger information and a new exterior livery. Maintained at Ashford, in-house by Southeastern since 12 January 2025, with technical support and spares from Hitachi.

Car types

CodeCarLengthDoors per side
DPTSDriving pantograph trailer (DPT)68 ft 6 in20.88 m2 single
MSMotor standard (MS)65 ft 7 in20.00 m2 single

Sources

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

Show the 22 sources from Wikimedia Commons, Southeastern, Brand Environment for Southeastern and 9 more
unverified

Know a source for one of these? Send it to us → (opens in a new tab)

Top