Rolling stock › In serviceData updated

Class 385

Hitachi's AT200 commuter electric train, the first of its kind, ordered for the newly electrified lines between Edinburgh and Glasgow. Due in service in autumn 2017, they were held back by a fault in the curved windscreen, through which drivers saw signals double at night ('ghosting'). ScotRail's 70 first carried passengers in July 2018 and run across the central belt.

Class 385, schematic side elevation, 4 cars
Class 385, schematic side elevation, 4 cars, in operation: pantographs raised to a contact wire at 4.7 mcontact wire 15 ft 5 in (4.7 m)
306 ft (93.28 m) (the cars’ lengths added)

Class 385 · schematic drawing GB Trains · gbtrains.uk/stock/385/ · CC BY 4.0

Schematic side elevation of a full train, drawn from the dimensions below. Drawn in ScotRail's livery from the Class 385 livery sheets in Transport Scotland's 2023 identity guidelines; a four-car 385/1. The three-car 385/0s have one intermediate car. Branding left out: ScotRail's Saltire mark and wordmark, its 'First Class' and '1st' lettering (the first-class '1' is drawn as a plain numeral), and the numbers. In operation: the pantograph raised to a contact wire 15 ft 5 in (4.7 m) above the rail, Network Rail's normal height (Network Rail, A Guide to Overhead Electrification, 2015; one wire, schematic). Drawn at 10 px per metre. Download SVG Download SVG · Use this drawing

You’re welcome to use this drawing

Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:

Drawing: GB Trains, gbtrains.uk, CC BY 4.0

Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers

Used it somewhere? Tell us where → (opens in a new tab)

Liveries

Former liveries 1

Abellio ScotRail SaltireFormer2018 to Mar 2022Not drawn yet

Compare with other trains →

Type
Electric multiple unit
Builder
Hitachi Rail: the first seven at Kasado, Japan, the other 63 at Newton Aycliffe
Built
2016–2019
In service
since 2018
Operators
ScotRail
Formation
3 cars (385/0) or 4 cars (385/1): driving cars 76 ft 1 in (23.18 m) and intermediate cars 72 ft 5 in (22.08 m) long over the body; up to four units run together as 12 cars
Trains in fleet
70: 46 three-car (385/0) and 24 four-car (385/1)
Fleets
ScotRail: 70
Top speed
100 mph (161 km/h)
Power
25 kV AC overhead · how it works
Bogies
Hitachi AT200 bogies, bolsterless and inside-framed (Class 385)
Train length
306 ft (93.28 m) (the cars’ lengths added)
Coupled
2 × 4 cars, about 612 ft (187 m) (the units’ lengths added); 7 cars (3 + 4), about 537 ft (164 m) (the units’ lengths added)
Profile
main-line
Seats per train
273
Total capacity
273 seats (20 first class) in a four-car 385/1 and 206 in a three-car 385/0; 479 in a seven-car train of one of each
Status
In service with ScotRail, all 70: 46 three-car (385/0) and 24 four-car (385/1) units, maintained by Hitachi at Craigentinny under a seven-year contract from April 2025.

Car types

CodeCarLengthDoors per side
DMCDriving motor composite (DMC)77 ft 7 in23.64 m2 double
TPSTrailer, pantograph, standard class (TPS)75 ft 6 in23.00 m2 double
TSTrailer, standard class (TS)75 ft 6 in23.00 m2 double
DMSDriving motor standard (DMS)77 ft 7 in23.64 m2 double

Sources

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

Show the 26 sources from Wikimedia Commons, Rail Engineer, Hitachi and 9 more
unverified

Know a source for one of these? Send it to us → (opens in a new tab)

Top